Typically you ll need a.
How to atach a gutter.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
Drill a 1 8 inch 0 32 cm pilot hole through the fascia and into the rafter tails at each chalk mark.
When installing gutters set the proper slope by driving a nail 1 2 in.
Cut a starter hole in the gutter with a chisel drill or sabre saw and nibble out the finished opening with tin snips.
Finally insert the filling into the hole and fasten it with short screws.
Attach the gutter s fascia brackets to the rafter tails.
If a gutter run will measure longer than 40 feet 12 m the gutter should be positioned to pitch down from the middle aimed toward a downspout at each end.
Step 2 drill a hole in the bottom of the gutter at the 4 inch mark with a 1 inch hole saw attachment to the drill.
Afterward attach the fascia brackets to using 1 4 inch 0 64 cm stainless steel lag screws at least 2 inches 5 1 cm long.
Measure and record the distance from the bottom of the fascia board to this nail.
Cut the downspout hole at the bottom end of the gutter and attach the gutter end caps.
Cut the gutter to length with a hack saw or a miter saw with a carbide tip blade.
Screw a downspout elbow to the outlet tube protruding down from the gutter.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.
Secure the downspout outlet to the gutter with four pop rivets or screws.
Hold another elbow against the house and cut a piece of downspout to fit between the two elbows.
Decide whether you want to use metal or plastic gutter materials and determine the appropriate spacing between the gutter brackets.
Gutters should be attached to the fascia and run the entire length of the roof ending with a downspout.
Below the shingles on the high side of the gutter run.
Attaching a gutter to metal roofing is a simple process so long as you have the wood rafter tails to screw gutter brackets into.
Place a step ladder under the area you are installing the downspout.