Using a downwards brushing motion firmly press the top layer of roofing felt onto the adhesive taking care to.
How much should roofing felt overlap.
Add new felt layers.
Adjacent pieces of drip edge should overlap at least 2 inches 51 mm.
Work up the roof to the peak and fold felt over the top overlapping at least 3 inches and fasten it on both sides.
Roofing felt is required to overlap 2 inches over the lower felt course.
Can t wait to begin the roofing.
Clean and prepare the roof.
Buy the roof felt.
Allow for felt overhang.
As the heat can partially melt the felt paper and the underside.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
The roofing felt should be applied in layers that overlap.
1 what you will need when felting a shed roof.
Metal sealing and fastening apply side lap sealant if the pitch of your roof is 2 12 or less.
Where the sheets overlap apply roofing sheet adhesive using a disposable brush.
Chalk lines should be snapped 33 5 8 above the eave line.
Nail along the top of this strip at 500mm.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
If this felt is either incorrectly situated i e.
When laying the metal panels on the roof the overlap ridge of the new panel should straddle the underlap ridge of the panel before it.
Do the other side of the roof the same way also with an overlap at the peak.
Tack and secure the felt.
Position this strip so that it overhangs the top of the first sheet by 75mm.
Take your second length of felt.
The drip edge should extend at least 2 inches on the roof.
After this lines should be snapped every 34 as you move up the roof.
The vertical leg of the drip edge should be at least 1 5 inches wide and extend at least 0 25 inches below the sheathing.
Roll out the first layer of felt.
The last layer should go over both sides of the roof overlapping both side covered in felt.
2 the process of felting a shed roof.
Must be installed at the rakes and eaves of the roof.
The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
For an apex roof start at the bottom and lay it horizontal the next should overlap as in video so the water runs over the join as it runs off the roof finishing at the apex or top of roof.
Trapped behind the guttering or if it is badly weathered it needs to be replaced.